Skip to main content

Process: Issue to Project

[Created: 02/09/2003 - Updated: 02/01/2000 ]
Description: Issue Material to Project from Receipt or manual Inventory Location
Help: Select a Project and either- Material Receipt- Expense Report<br<- Inventory Location and Project Line not issued yet- Inventory Location, Product and QuantityThe default Movement Date is today's date.
Class: org.compiere.process.ProjectIssue

Table: Process Parameters

NameDescriptionHelpTechnical Info
ProjectFinancial ProjectA Project allows you to track and control internal or external activities.C_Project_ID
Table Direct
Shipment/ReceiptMaterial Shipment DocumentThe Material Shipment / ReceiptM_InOut_ID
Search
Expense ReportTime and Expense ReportS_TimeExpense_ID
Table Direct
LocatorWarehouse LocatorThe Locator indicates where in a Warehouse a product is located.M_Locator_ID
Locator (WH)
Project LineTask or step in a projectThe Project Line indicates a unique project line.C_ProjectLine_ID
Table Direct
ProductProduct, Service, ItemIdentifies an item which is either purchased or sold in this organization.M_Product_ID
Search
Attribute Set InstanceProduct Attribute Set InstanceThe values of the actual Product Attribute Instances. The product level attributes are defined on Product level.M_AttributeSetInstance_ID
Product Attribute
Movement QuantityQuantity of a product moved.The Movement Quantity indicates the quantity of a product that has been moved.MovementQty
Quantity
Movement DateDate a product was moved in or out of inventoryThe Movement Date indicates the date that a product moved in or out of inventory. This is the result of a shipment, receipt or inventory movement.MovementDate
Date
DescriptionOptional short description of the recordA description is limited to 255 characters.Description
String