Skip to main content

Process: Standard Cost Update

[Created: 21/02/2002 - Updated: 10/03/2022 ]
Description: Set standard and future cost price
Help: For Standard Costs you can set/recalculate the current or future cost price (for the cost type of the accounting schema). If the Costing Level of the Accounting Schema is set to Tenant, missing cost records are created. The historical costs are calculated based on the accumulated amount/quantity of the costing method.
Class: org.compiere.process.CostUpdate

Table: Process Parameters

NameDescriptionHelpTechnical Info
Product CategoryCategory of a ProductIdentifies the category which this product belongs to. Product categories are used for pricing and selection.M_Product_Category_ID
Table Direct
Set Standard Cost toSet new Standard Costs to the selectionSetStandardCostTo
List
Set Future Costs toSet the Future costs to the selectionSetFutureCostTo
List
Pricelist VersionOnly used if Price List is used to set future/standard cost priceM_PriceList_Version_ID
Table Direct
Document TypeInventory Cost Adjustment Document TypeC_DocType_ID
Table